Main Content Linkसार्वजनिक सुनावणी तपशील 24/11/2020
अनुक्रमांक | उद्योगाचे नावं व पत्ता | कार्यकारी सारांश / सीआरझेड मसुदा अधिसूचना | तारीख आणि वेळ | पर्यावरणविषयक सार्वजनिक सुनावणीचा आदेश | शेरा |
---|---|---|---|---|---|
11 | Proposed Sanitary Landfill site for common Municipal Solid Waste Management Facility at Gut-No.67 (Reservation No.A41), Slaughterhouse Extension, Padegaon, Chhatrapati Sambhajinagar having capacity 150 MTD. Proposed by M/s.Chhatrapati Sambhajinagar, Municipal Corporation. | EIA Summary | १३ जून २०२५ | इथे क्लिक करा | |
12 | Proposed public hearing for Brownfield Project for Expansion of Existing Project for the Manufacturing of Explosives and Defense Products LOCATED AT Village – Sawanga, Post – Shiva, Tehsil and District Nagpur - 440023, Maharashtra | इथे क्लिक करा | १२ जून २०२५ | इथे क्लिक करा | इथे क्लिक करा |
13 | M/s. Shree Malhar Minerals, Plot No. 15, R.S. No. 109/1/B, C Ward, Sita Colony, Opposite Jain Boarding, Karveer, District-Kolhapur, Maharashtra at Parali Bauxite Mine, Gat No. 223 (P), Village-Parli, Taluka-Shahuwadi, District-Kolhapur. | इथे क्लिक करा | ०९ जून २०२५ | इथे क्लिक करा | |
14 | M/s. Million Steels Pvt. Ltd., Plot No. 1417-A, Deshpande Layout, Wardhaman Nagar, Nagpur | इथे क्लिक करा | ३० मे २०२५ | इथे क्लिक करा | इथे क्लिक करा |
15 | Construction of Nagpur - Gondia Access Controlled Super Communication Expressway Starting at Gavasi in Nagpur District and ends at Lodhi Tola in Gondia district (Ch. 0.000 to Ch. 144.807). In addition to the main alignment two feeder routes are included in Package I i.e., Gondia Bypass (Ch. 0.000 to Ch. 13.744) and Tiroda Feeder Route (Ch. 0.000 to Ch. 3.826). - Nagpur | इथे क्लिक करा | १६ मे २०२५ | इथे क्लिक करा | |
16 | Bhandara-Gadchiroli Access controlled express way (Nagpur District Component) | इथे क्लिक करा | १६ मे २०२५ | इथे क्लिक करा | |
17 | Ghungur Bauxite Block-II Villages - Ghungur, Taluka –Shahuwadi, District –Kolhapur, State - Maharashtra Peak production capacity - 90,000 TPA Mining Lease Area 10.65 Ha (Forest Land), & Area for Transportation Road 3.21 Ha (Forest Land), Proposed by Shri Jugai Minerals Ghungur Main Road, Post – Bandiwadi Taluka – Shahuwadi, District – Kolhapur | इथे क्लिक करा | २९ एप्रिल २०२५ | इथे क्लिक करा | |
18 | Parli Bauxite Mine is located in villages Parli of Shahuwadi Taluka of Kolhapur District, Maharashtra. By M/s. Shree Malhar Minerals, Sita Colony, Opp Jain Boading, Karveer, Dist-Kolhapur | इथे क्लिक करा | २३ एप्रिल २०२५ | इथे क्लिक करा | इथे क्लिक करा |
19 | Proposed Expansion in Limestone Production Capacity from 2.0 Million TPA to 3.5 Million TPA, in Maratha Limestone Mine - II (ML Area – 880.31 ha) in Villages- Bakhardi, Upparwahi, Chandur, Pimpalgaon, Lakhmapur and Thutra (Tehsil: Korpana) and Sonapur (Tehsil: Rajura), DistrictChandrapur, State: Maharashtra. Proposed by M/s. Ambuja Cements Ltd, (unit Maratha cements works). | इथे क्लिक करा | ०३ फेब्रुवारी २०२५ | इथे क्लिक करा | |
20 | Expansion and Modification of an existing plant facilities (62,700 TPA DRI to 92,400 TPA DRI, 4MW WHRB to 5 MW WHRB), 2X4.5 MTPA Iron Ore Grinding Unit, 10.0 MTPA Thickening & Filtration Unit and 2X4.0 MTPA Iron Ore Pellet Plant by setting an additional Integrated Steel Plant (ISP) of 4.5 MTPA Capacity with 483 MW (488MW total) Captive Power Plant and 5.0 MTPA Filtration Unit at Location: Plot No. A-1, MIDC Konsari, Survey No. 174, 198, 214, 217-229, 231-351, 354-402, 404-433, 435, 438-467, 469-471, 474-494, 511-512, 516-517, 551-552, 559-561, 564-610, 612-617, 623, 635-638, 641-657, 664-703, 708-718 at Village Konsari; Tahsil- Chamorshi, District Gadchiroli, Maharashtra by M/s Lloyds Metals and Energy Limited. | इथे क्लिक करा | २३ जानेवारी २०२५ | इथे क्लिक करा | इथे क्लिक करा |