Section Title

Main Content Link
Public Hearing Details as on 25/11/2020
Sr. No. Name of Industry & Address Executive Summary/CRZ Draft Notification Date & Time Environmental Public Hearing Order Remarks/Advertisement
141 Proposed by Finecrafts Steel & Power Private Limited. At Khasra No. 3 to 15, 30 to 32, 273 -Village Laxmanpur and Khasra No. 12 to 14, 17 to 33 -Village Mudholi Chak No. 2, Taluka Chamorshi, District Gadchiroli. Proposed Steel Plant (Green Field) with 8 × 650 TPD DRI Kilns-Sponge Iron (17,16,000 TPA), 1 × 65T Electric Arc Furnace (5,40,000 TPA) along with 1 × 65T LRF, 1 × 4-Strand Billet Caster (5,24,000 TPA), Rolling Mill (Bar & Rod Mill 5,00,000 TPA) And with 6 × 30T Induction Furnaces, 2 × 30 Click Here -
142 ENVIRONMENTAL IMPACT ASSESSMENT (EIA) MALSHEJ GHAT BHORANDE PUMPED STORAGE PROJECT (1500 MW) Tehsil Junnar & Murbad, District Pune & Thane, Maharashtra (Sector 1(c); Cat “A”). Click Here -
143 Mundra Dolomite Mine Dolomite @530000TPA (Average)Peak Production 900000 TPA, Proposed by M/s K.K. Mines & Mineral Near Gajanan Mandir,13-14 Adarsh Gruhnirman Society Nagpur Road Chandrapur 442402. Click Here -
144 Chilai-Mundra Dolomite Mine Dolomite @526000TPA (Average)Peak Production 980000 TPA) Project M/s K.K. Mines & Minerals Chilai-Mundra Dolomite Mine (Mine Lease Area 12.22 Hectares), Proposed by M/s K.K. Mines & Mineral Near Gajanan Mandir,13-14 Adarsh Gruhnirman Society Nagpur Road Chandrapur 442402. Click Here -
145 proposed Adegaon Limestone Mine, 101250 TPA Peak Production (83295 TPA Average Production),ADEGAON LIMESTONE MINE KHASRA NO.620/2,621/2, VILLAGE ADEGAON, TEH. ZARI ZAMNI DIST. YAVATMAL. Proposed by ABHISHEK RAI “NANHAKA”, 10, E. HIGH COURT ROAD RAMDASPETH NAGPUR 440 010 (MS). Click Here -
146 Proposed Adegaon Dolomite Mine For Dolomite Production @ 474900 TPA (Average Production) & Peak 487200TPA (Mine Lease Area 10.17Hectares), Proposed by MR. KISHOR EKNATHRAO KODGIRWAR SADHANKARWADI MAUZA CHIKHALGAO TQ WANI DIST. YAVATMAL. Click Here -
147 Gadegaon Opencast Mine, Wani Area, WCL Tehsil-Korpana, Dist-Chandrapur, State-Mahrastra for production capacity of 3.00 MTPA and Mine Lease Area of 615.56. Click Here -
148 Proposed Manufacturing Unit for the Production of Biodiesel having Capacity 30 TPD along with Production of Soap 10 TPD and Fatty Acid 10 TPD, Located at Survey No.: 32/3 & 34/A, Plot No.: 2-1/1C, Village: Balapur, Taluka: Dharmabad, District: Nanded. Proposed by M/s. MVP Oils and Energies Private Limited. Click Here -
149 Proposed Amalgamation & Modernization of Existing Metallurgical Activity at Plot  D-2, D-3, D-3/1 & D-3/2, Kagal- Hatkanangale five start MIDC Kolhapur, Maharashtra, Proposed by M/s.Ghatge Patil Industries Ltd (Plant-2). Click Here -
150 M/s Torrent PSH4 Pvt Ltd are developing a 1200 MW capacity Saidongar-2 Maval Pumped Storage Project (i.e., PSP) at village Pali Tarf Kotal Khalati, Saidongar Village, Tal. Karjat, Dist. Raigad and  Kusur Village, Tal. Maval, Dist. Pune. Click Here -