| 51 |
Gazette Notification No GSR 724(E) dtd. 04.10.2021 regarding ‘Regulation on Appropriate Use of Reverse Osmosis Based Water Purification System’ |
MPCB |
01-08-2023 |
Circular |
|
| 52 |
Regulation on Appropriate Use of Reverse Osmosis Based Water Purification System in the States/UTs – notification regarding |
MPCB |
01-08-2023 |
Circular |
|
| 53 |
Gazette Notification No. GSR 436 (E) dated 14th June 2023 allowing supply of diesel genset and diesel genset engines with existing standards till 30th June 2024 |
MPCB |
23-06-2023 |
Circular |
|
| 54 |
Retrofitting of Emission Control Device (RECD) for in-use Diesel operated internal combustion engines up to 800kW (1000KVA) gross mechanical power for generator set" for Implementation in the State of Maharashtra |
MPCB |
02-06-2023 |
Circular |
|
| 55 |
Post facto approvals for proposed public hearing to be conducted |
MPCB |
25-05-2023 |
Circular |
|
| 56 |
Revised Guidelines for Environmentally Sound Facilities for Handling and Scrapping of End-of- Life Vehicles (ELVs) March 2023 published by CPCB for effective implementation in the state of Maharashtra |
MPCB |
03-04-2023 |
Circular |
|
| 57 |
COVID Pandemic-Lockdown Period exempted from submission of application for consent/authorisation |
MPCB |
29-03-2023 |
Circular |
|
| 58 |
Circular regarding Consent Processing |
MPCB |
23-01-2023 |
Circular |
|
| 59 |
Hon'ble NGT (PB) order dated 29.08.2022, in Original Application No. 272/2022, In re: News item published in The Times of India dated 12th April, 2022, titled “Six kifled in chemical factory blast in Gujarat |
MPCB |
22-12-2022 |
Circular |
|
| 60 |
Revise the validity of Consent to establish to 10 years for infrastructure projects. |
MPCB |
16-12-2022 |
Circular |
|
| 61 |
Standardization of Membership Certificate to be issued by Common Bio-Medical Waste Treatment Facility in the state of Maharashtra |
MPCB |
07-12-2022 |
Circular |
|
| 62 |
Plastic Notification (Amendment - Dtd.30/11/2022) |
MPCB |
30-11-2022 |
Circular |
|
| 63 |
Circular w.r.t. Amendment in Consent to Establish/Operate/renewal of Consentw.r.t. Strong Steam and its path of Disposal of the industries |
MPCB |
21-09-2022 |
Circular |
|
| 64 |
Pre-Processing / Co-Processing of Hazardous waste in the state of Maharashtra. |
MPCB |
23-08-2022 |
Circular |
|
| 65 |
Environmental Standards for Brick Kilns vide notification GSR No. 143 (E) dtd. 22/02/2022 and CPCB Letter for implementation. |
MPCB |
04-08-2022 |
Circular |
|
| 66 |
Single Use Plastic (SUP) corrigendum (Dtd.27/07/2022) |
MPCB |
27-07-2022 |
Circular |
|
| 67 |
MoEFCC notification SO 3250(E) dtd. 20/7/2022 regarding applicability of Environmental Clearance to rolling mills |
MPCB |
20-07-2022 |
Circular |
|
| 68 |
Single Use Plastic (SUP) notification (Dtd.15/07/2022) |
MPCB |
15-07-2022 |
Circular |
|
| 69 |
Delegation of power to RO for granting NOC for disposal of Fly ash generating for coal base thermal power plant. |
MPCB |
12-07-2022 |
Circular |
|
| 70 |
Provision of penal fees for occupying violating combine consent regime prescribed under Air/Water Act reg. |
MPCB |
12-07-2022 |
Circular |
|
| 71 |
Delegation of Power For Grant of CCA to Bedded (1 & Above) HCEs |
MPCB |
06-06-2022 |
Circular |
|
| 72 |
City Level Task Force (CLTF) for taking up measures to eliminate single use plastic. (Dtd. 26/04/2022) |
MPCB |
26-04-2022 |
Circular |
|
| 73 |
Services provided under Section 3 of the Maharashtra Right to Public Services Act, 2015 by Maharashtra Pollution Control Board working under Environment Department |
MPCB |
30-03-2022 |
Circular |
|
| 74 |
Maharashtra Plastic and Thermocol Products (MUSTH&S) Notification(Amendment), (Dtd.28/03/2022) |
MPCB |
28-03-2022 |
Circular |
|
| 75 |
Constitution of District Level Task Force (DLTF) for taking up measures to eliminate single use plastic. (Dtd. 26/04/2022) |
MPCB |
26-02-2022 |
Circular |
|
| 76 |
Chandrapur Lab Water Analysis |
MPCB |
11-02-2022 |
Circular |
|
| 77 |
Circular on revision of HCE Category and Applicability of CCA to All HCE |
MPCB |
04-02-2022 |
Circular |
|
| 78 |
Analysis of samples and entry of results in the LIMS system |
MPCB |
28-12-2021 |
Circular |
|
| 79 |
Standard Operating Procedure for complaint redressal in the Board's web portal. |
MPCB |
17-11-2021 |
Circular |
|
| 80 |
Mandatory to Obtain CCA From MPCb reg |
MPCB |
11-11-2021 |
Circular |
|
| 81 |
Circular to prohibit/ discourage use of Single use plastic and promote alternatives within/ outside the office premises. |
MPCB |
27-10-2021 |
Circular |
|
| 82 |
Order regarding establishment of Water Cess Recovery Cell |
MPCB |
22-10-2021 |
Circular |
|
| 83 |
State Level Special Task Force (STF) for taking up measures to eliminate single use plastic. (Dtd. 12/10/2021) |
MPCB |
12-10-2021 |
Circular |
|
| 84 |
All Regional Officer & Sub Regional Officer are hereby directed to circulate Attached referred guideline to various concerned stakeholders and ensure effective implementation in the state of Maharashtra. |
MPCB |
08-10-2021 |
Circular |
|
| 85 |
Directions under section 5 of the environment (protection) act, 1986 to not grant or renew cto unless environment clearance, as applicable, has been obtained- regarding |
MPCB |
20-09-2021 |
Circular |
|
| 86 |
Policy decision regarding consent management for solid waste processing plants / facilities |
MPCB |
06-09-2021 |
Circular |
|
| 87 |
Please find Attached herewith Circular for Implementation of CPCB Guidelines for setting up of New Petrol Pumps in compliance of Hon’ble NGT Order Dated 18.01.2019 in OA No. 86/2019 |
MPCB |
16-08-2021 |
Circular |
|
| 88 |
Implementation of newly developed "Laboratory Information Management System" (Lims) Module |
MPCB |
30-07-2021 |
Circular |
|
| 89 |
Implementation of newly developed "JVS Module" |
MPCB |
30-07-2021 |
Circular |
|
| 90 |
Re-Rolling/cold Rolling units/cold rolled coils established or operating with consent to establish/operate from SPCB required environment clearance |
MPCB |
20-07-2021 |
Circular |
|
| 91 |
To grant emergency Permission to industries for Operation of Medical Oxygen Manufacturing Plants in view of COVID-19 situation in the state of Maharashtra |
MPCB |
16-04-2021 |
Circular |
|
| 92 |
Condition to be incorporated in the consent to establish / Operate |
MPCB |
24-03-2021 |
Circular |
|
| 93 |
Constitution of Committee for Circular Economy in Tyre and Rubber Recycling Industry - reg. |
MPCB |
11-03-2021 |
Circular |
|
| 94 |
Amendment/ Clarification in the Circular related to policy Decision regarding Amendment in consent to operate of leading brand owners and plastic producers for use of recycled plastic in plastic packaging and plastic ietms |
MPCB |
03-02-2021 |
Circular |
|
| 95 |
Guideline for handling of BMW utilization |
MPCB |
19-01-2021 |
Circular |
|
| 96 |
Revised delegation of powers for Consent Management |
MPCB |
23-12-2020 |
Circular |
|
| 97 |
Amendment in Consent to Operate of leading brand owners and plastic producers for use of recycled plastic in plastic packaging and plastic items |
MPCB |
18-11-2020 |
Circular |
|
| 98 |
Circular regarding Implementation of colour as a parameter as per MoEF & CC GSR 325-E dtd 07.05.2014 & GSR No. 978 dt. 10.10.2016 |
MPCB |
16-11-2020 |
Circular |
|
| 99 |
Services to be provided under Section 3 of the Maharashtra Right to Public Services Act, 2015 by Maharashtra Pollution Control Board working under Environment Department. |
MPCB |
24-08-2020 |
Circular |
|
| 100 |
Uploading of visit report on boards IMIS application within 48 hours - regd. |
MPCB |
20-08-2020 |
Circular |
|