| Revision of Consent Fees for Renewal of consent of Infrastructure Projects which are handed over to society. |
MPCB |
02-01-2024 |
Circulars |
|
| Circular regarding Extension of time limit for Retro-fitting of emission control device (RECD) for in use diesel operated internal combustion engines (D.G. Set) in the state of Maharashtra. |
MPCB |
27-10-2023 |
Circulars |
|
| Regulation on Appropriate Use of Reverse Osmosis Based Water Purification System in the States/UTs – notification regarding |
MPCB |
01-08-2023 |
Circulars |
|
| Retrofitting of Emission Control Device (RECD) for in-use Diesel operated internal combustion engines up to 800kW (1000KVA) gross mechanical power for generator set" for Implementation in the State of Maharashtra |
MPCB |
02-06-2023 |
Circulars |
|
| Policy for use of pet coke and Furnace Oil as a fuel in the state of Maharashtra |
MPCB |
05-02-2020 |
Circulars |
|
| COVID Pandemic-Lockdown Period exempted from submission of application for consent/authorisation |
MPCB |
29-03-2023 |
Circulars |
|
| Revise the validity of Consent to establish to 10 years for infrastructure projects. |
MPCB |
16-12-2022 |
Circulars |
|
| Circular regarding Consent Processing |
MPCB |
23-01-2023 |
Circulars |
|
| Standardization of Membership Certificate to be issued by Common Bio-Medical Waste Treatment Facility in the state of Maharashtra |
MPCB |
07-12-2022 |
Circulars |
|
| Guideline for handling of BMW utilization |
MPCB |
19-01-2021 |
Circulars |
|