Section Title

Main Content Link
Title Circular Types Date Standing Order Type Document
Extension of Amnesty Scheme for Penal Fees for violating combined consent Regime MPCB 27-06-2024 Circular
Imposing 12% Interest on non submission of Bank Guarantee within prescribed time limit imposed by the Board MPCB 29-02-2024 Circular
Amnesty Scheme for Penal Fees for violating combined consent Regime MPCB 27-02-2024 Circular
Amendment in Pre-Processing / Co-Processing of Hazardous waste in the state of Maharashtra. MPCB 15-02-2024 Circular
Processing fees for Authorization issued as per the Hazardous and Other waste (M & MT) Rules, 2016 MPCB 30-01-2024 Circular
Environmental Guidelines for Stone Crusher units in the State of Maharashtra MPCB 11-01-2024 Circular
Environment standards with Siting Criteria for Hot Mix Plants in the State of Maharashtra MPCB 11-01-2024 Circular
Submission of Bank Guarantee/Penal Fees/ Consent Fees in applications for consent MPCB 05-01-2024 Circular
Revision of Consent Fees for Renewal of consent of Infrastructure Projects which are handed over to society. MPCB 02-01-2024 Circular
Circular regarding Extension of time limit for Retro-fitting of emission control device (RECD) for in use diesel operated internal combustion engines (D.G. Set) in the state of Maharashtra. MPCB 27-10-2023 Circular
Gazette Notification No GSR 724(E) dtd. 04.10.2021 regarding ‘Regulation on Appropriate Use of Reverse Osmosis Based Water Purification System’ MPCB 01-08-2023 Circular
Regulation on Appropriate Use of Reverse Osmosis Based Water Purification System in the States/UTs – notification regarding MPCB 01-08-2023 Circular
Gazette Notification No. GSR 436 (E) dated 14th June 2023 allowing supply of diesel genset and diesel genset engines with existing standards till 30th June 2024 MPCB 23-06-2023 Circular
Retrofitting of Emission Control Device (RECD) for in-use Diesel operated internal combustion engines up to 800kW (1000KVA) gross mechanical power for generator set" for Implementation in the State of Maharashtra MPCB 02-06-2023 Circular
Post facto approvals for proposed public hearing to be conducted MPCB 25-05-2023 Circular
Revised Guidelines for Environmentally Sound Facilities for Handling and Scrapping of End-of- Life Vehicles (ELVs) March 2023 published by CPCB for effective implementation in the state of Maharashtra MPCB 03-04-2023 Circular
COVID Pandemic-Lockdown Period exempted from submission of application for consent/authorisation MPCB 29-03-2023 Circular
Circular regarding Consent Processing MPCB 23-01-2023 Circular
Hon'ble NGT (PB) order dated 29.08.2022, in Original Application No. 272/2022, In re: News item published in The Times of India dated 12th April, 2022, titled “Six kifled in chemical factory blast in Gujarat MPCB 22-12-2022 Circular
Revise the validity of Consent to establish to 10 years for infrastructure projects. MPCB 16-12-2022 Circular