 |
Sampling
charges for Ambient Air/ Fugitive Emission Samples |
 |
Source
Emission Monitoring / Sampling Charge |
 |
Noise
Monitoring |
 |
Bio-Medical Waste |
 |
Sampling
charges for Water and Waste Water Samples |
 |
Sampling Charges for Soil Samples |
 |
Hazardous
Waste Sample collection charges at the premises of Industry/Import
site/Disposal site |
| Sampling Charges(Applicable w.e.f.April 01, 2010) |
| Sampling charges for Ambient Air/ Fugitive Emission Samples |
Sr. No. |
Type of sampling |
Charges in Rs. |
|
Air Monitoring |
|
|
(a) Sampling (upto each 8 hrs.) |
2,000/- |
|
For Suspended Particulate Matter and Gaseous Pollutants |
|
|
(b) Sampling (24 hrs.) For Suspended Particulate Matter
and Gaseous Pollutants |
6,000/- |
| |
(c) Sampling of Volatile Organic Compounds (VOCs)/Benzene Toluene Xylende (BTX) |
2,000/- |
| |
(d) Sampling of Poly Aromatic Hydrocarbons (PAHs) |
2,500/- |
Note: -
(i) Sample collection charges includes transportation and visit charges unless mentioned specially.
(ii) Sample analysis charges of respective parameters are separate
as per list.
|
|
Source Emission Monitoring / Sampling Charge |
Sr. No.
|
Type of Sampling |
Charges
in Rs. |
1 |
Sampling measurement of velocity, flow
rate, temperature and molecular weight of Flue Gas (each
specific location/ each sample in duplicate for the mentioned
parameter.) |
5,500/- |
2 |
Sampling of SO2 / NO2 |
2,000/- |
3 |
Sampling of PAHs |
3,000/- |
4 |
Sampling of VOCs/BTX |
3,500/- |
Note:
-
(i) Sampling collection charges includes transportation and visit charges unless mentioned specifically..
(ii) Sample analysis charges of respective parameters
are seperate.
as per list. |
|
 |
Noise Monitoring |
Sr. No. |
Type of Sampling |
Charges in Rs. |
1 |
First Monitoring |
4,000/- |
2 |
Each subsequent monitoring within same premises |
2,000/- |
3 |
For 08 hours Continuous Monitoring or more |
10,000/- |
| Note: - Sample collection charges includes transportation and visit charges unless mentioned specifically. |
|
| |
Bio-Medical Waste: |
Sr. No. |
Type of Sampling |
Charges in Rs. |
1 |
Sampling of Autoclave for validation of Spore test |
500/- |
2 |
Analysis |
500/- |
| Note: - Sample collection charges includes transportation and visit charges unless mentioned specifically. |
|
Sampling charges for Water and Waste Water Samples |
Sr.
No. |
Type of sampling |
Charges in Rs. |
1
|
GRAB SAMPLING |
|
1. Grab Sampling /sample/place |
550/- |
2. For every additional Grab sampling
at same
point. |
250/-
|
2
|
COMPOSITE SAMPLING |
|
1. Composite Sampling/source/place
up to 8 hrs. |
1,000/- |
| -do- 16 hrs |
2,000/- |
| -do- 24 hrs. |
3,000/- |
2. For every additional composite
sampling/ |
|
| sample place but different source
upto 8 hrs. |
550/- |
| - do - 16hrs. |
1,100/- |
| - do - 24hrs. |
1,650/- |
3
|
Flow rate measurement / source-once |
400/- |
| -do- -every additional |
150/- |
| |
Note:(i) Sample collection charges includes transportation and visit charges unless mentioned specifically.(ii) Sample analysis charges of respective parameters are separate as per list.
|
|
|
|
 |
Sampling Charges for Soil Samples
|
Sr. No. |
Type of Sampling |
Charges in Rs. |
1 |
Grab sampling /sample/ place |
600/- |
2 |
for every additional Grab sampling/same place |
300/- |
Note:i) Sample collection charges includes transportation and visit charges unless mentioned specifically. ii)Sample analysis charges of respective parameters are separate
as per list. |
|
Hazardous Waste Sample collection charges at the premises of
Industry/Import site/Disposal site. |
Sr. No. |
Type of Sampling |
Charges in Rs. |
1 |
Integrated Sample collection charges |
1,000 |
Note: -
(i) Sample Collection charges includes transportation and visit charges unless mentioned specifically..
(ii) Sample analysis charges of respective parameters
are separate
as per list. |
|